Coriolis mass flowmeter installation requirements

Coriolis mass flowmeter installation requirements

Mass flowmeters, as sophisticated measuring instruments, have very high installation requirements. In the installation, the location of the installation must be clearly stated. When installing the sensor, protect the sensor from damage. We must also do a good job of vibration reduction. Of course, there are some other considerations. The following articles have specific instructions.
First, Tianchen Bo Rui mass flow meter installation location
1) The installation location should be far away from sources of interference that can cause mechanical vibration in the pipeline, such as pumps in process lines. If the sensors are used in series on the same pipeline, the mutual influence due to resonance should be particularly prevented and the distance between the sensors should be at least three times greater than the width of the overall dimensions of the sensor.
2) The installation position of the sensor should pay attention to the expansion and contraction of the process pipeline due to temperature changes, and in particular it cannot be installed near the expansion joint of the process pipeline. If it is installed near the expansion joint, the transverse stress will be caused due to the expansion and contraction of the pipeline, which will cause the sensor zero point to change and affect the measurement accuracy.
3) The installation position of the sensor should be far away from the sources of industrial electromagnetic interference, such as high-power motors, transformers, etc. Otherwise, the self-resonance of the measuring tube in the sensor may be disturbed, and the weak signal detected by the speed sensor may be submerged in the noise of electromagnetic interference. in. The sensor should be at least 5 meters away from the transformer and motor.
4) The installation position of the sensor should ensure that the fluid in the pipeline is always filled with the sensor measuring tube and there is a certain pressure, which requires that the installation position should be at the low end of the pipeline.
Second, the choice of mass flowmeter sensor installation method
The installation method of the sensor is mainly determined according to the phase of the fluid and its process conditions. There are three installation methods.
1) The horizontal mounting body faces downwards: If the fluid to be measured is a liquid, the sensor is generally installed with the housing facing downward to prevent the air from accumulating in the sensor vibrating tube so as to accurately measure the mass flow.
2) The horizontal mounting body is facing upwards: If the fluid to be measured is a gas, the sensor is generally installed with the housing facing upward to prevent the condensate from accumulating in the sensor vibrating tube.
3) Flag installation: If the fluid to be measured is a liquid, solid mixture slurry, the sensor is installed in a vertical pipe, which prevents particles from accumulating in the sensor Coriolis force measuring tube. In addition, if the process pipeline needs to be cleaned with gas and steam, this installation method can also facilitate the cleaning, but this installation method is more difficult to fix than the former two, and the pressure loss is greater.
Third, other precautions in the installation process
1) Before installing the sensor on the process line, it is necessary to confirm whether the speed sensor coil, the DC resistance of the drive coil, and the resistance value of the platinum resistance thermometer are normal.
2) The sensor mounting flange must be coaxially connected with the pipe flange so as to reduce the installation stress and ensure the measurement accuracy. When installing, it should be ensured that the pipe supports only support the process pipe and the sensor is not allowed to support the process pipe. The sensor housing should be kept free from contact with any objects.
3) When the sensor is installed in the process pipeline, ensure that the piping system and the sensors at the upstream and downstream sides of the sensor are firmly connected at two locations. All threaded connections must be fastened. Clamping the process piping helps to reduce potential vibration disturbances. .
4) Avoid using the sensor housing to move the sensor during installation.
5) Valves or pumps on the process line near the sensor mounting position need to have their own support and cannot support the valve and pump with a support that supports the sensor.
6) Stop valves should be installed upstream and downstream of the sensor.
7) Eliminate installation stress: When installing the sensor, in order to eliminate the installation stress, the most effective method is to first pipe, pre-install the process pipeline and the valve and the sensor as a whole, then lifting, and then welding it with the process master line. In order to make the best effect of stress relief, the sensor, stop valve and process line should be in the same vertical plane.
Fourth, damping
1) When installing the sensor, it is necessary to choose a suitable installation location. In addition to keeping away from the vibration source, in order to eliminate the influence of vibration on the measurement, the way in which the support rod firmly supports the pipeline and the valve is also used in the installation. The lower end of the support rod must be fixed on a stable foundation, and the upper end cooperates with the pipeline clamp to support the process pipeline. Do not use sensor housings to support sensors and pipe lines, valves, pumps, etc.
2) After the sensor is installed, its housing should be free to hang. For the installation method (1) the horizontal installation body is facing downwards, (2) the horizontal installation body is facing upwards, and the support rod should be distributed symmetrically with the sensor as the center. For the installation method (3) flag installation, the selection of support points depends on the specific circumstances. If the lower end of the support bar is fixed on the ground, it must be cement and reinforced ground. The purpose is to stabilize the support and also play a role in damping vibration. The more stable the foundation, the better its vibration damping.
The above is the installation requirements for all Tianchen Bo Rui mass flowmeters. In the measurement process using mass flowmeters, we must ensure the accuracy of measurement. First of all, we must do a good job in the installation of mass flowmeters, and we must do stress elimination.

Auto-Gripper Under overhead-crane

The special-purpose gripper used in traditional Spun Pile production industry.

The special-purpose gripper is suitable for spinning and curing place of spun pile production flow.

The application scope of special-purpose gripper:φ300---φ600 standard Spun Pile Mould ,Length 15m and below.

Auto-gripper of crane for spun pile mold

Auto-Gripper

Auto-Gripper,Spun Pile Spinning Machine,Concrete Pile Auto-Gripper,Concrete Pole Auto-Gripper

Jiangsu Haiheng Building-Materials Machinery Co.,Ltd , https://www.jshaiheng.com