Baling petrochemical thermal power fly ash turning waste into treasure

Baling petrochemical thermal power fly ash turning waste into treasure

The Baling Petrochemical Thermal Power Division has comprehensively used fly ash as a by-product of power generation. Since it was put into operation in 2000, fly ash sales volume has increased from the initial 2,000 tons to 210,000 tons in 2007, and cumulative sales have reached 850,000 tons. Turn waste into treasure, increase income and create profits.

In the case that the quality of the coal quality of the plant is not good enough to bring about the difficulty of collecting the ash, the department proposed the goal of “zero discharge” of the ash slag, strengthened the technical transformation of the equipment, and adjusted the combustion conditions of the boiler. Test, timely and reasonable adjustment of operating parameters, so that the boiler always maintain the best conditions for stable operation; at the same time the Ministry of strengthening the inspection of ash collection equipment, to ensure that the ash is not missing. In March last year, the ministry successfully produced secondary fly ash. Some products even met national-level standards and were favored by high-end customers. Last year, only secondary ash sales achieved an effect of nearly 1 million yuan.

Automotive Interior Plastic Injection Mould includes automotive dashboard Plastic Injection Mould, automotive interior console plastic injection mould, automotive A, B, C pillar mould, automotive air conditioner plastic mould, automotive seat plastic injection mould and all other interior plastic accessories mould.


Automotive Interior Plastic Injection Mould Automotive Interior Plastic Injection Mould

Automotive Interior Plastic Injection Mould Automotive Interior Plastic Injection Mould



FAQ:


Q1: What tolerances can you achieve for Automotive Interior Plastic Injection Mould?


There is not a given set of tolerances that fits all processes and materials. In every case, the final tolerances on your part will depend on a number of factors, including but not limited to:

  • Part size
  • Design geometry
  • The number, type, and size of features
  • Material(s)
  • Surface finish
  • Manufacturing process

We will review your design and provide a design for manufacturing review, pointing out any areas where we may not be able to achieve your desired tolerances. It`s helpful to us if you can specify which areas in your design have critical tolerances that must be met and which can be slightly modified if needed to reduce time and costs involved.


Q2: How do you ensure your Automotive interior plastic mould quality?  

In order to deliver high-quality parts every time, we`ve instituted the following steps to ensure you get parts that meet and exceed your expectations.


  • A full design for manufacturing (DFM) review upon initial inquiry. This will be performed by our skilled engineering team, who will alert you to any issues before work begins.
  • All incoming material (metal and plastic) is 100% inspected using our in-house metrology equipment.
  • In-process and first article inspection.
  • Comprehensive final inspection with a full report.


Q3: Is the lead time in working days or calendar days?     

Lead times are quoted in working days. As per our terms and conditions, quoted lead times commence only after completion and confirmation of design for manufacturing review and the beginning of actual production.


Q4: How long does a quotation take?    

In most cases, we respond within a couple of days of receiving an RFQ. However, there may be situations when we must source material from an external supply and therefore the quotation may be delayed accordingly.


Q5: What is the difference between a multi-cavity mold and a family mold?    


A multi-cavity mold has multiple cavities of the same part; a family mold produces a set. For instance, for an electronic enclosure, you may need a front, back, battery door, and a button. Those could all be molded at once in a family mold.


Q6: How long does it take to build an Automotive air conditioner injection mold?


Depending on complexity and our tool room load, it can range from 2 to 12 weeks.


Q7: Can I modify the mold after the first run?    


We can modify our steel molds by additional machining, fill-in welding, welding in additional material, or inserting a replacement feature, for a reasonable cost. If the changes are too great, however, producing a new mold may be more cost-effective than reworking the existing one.



Automotive Interior Plastic Injection Mould

Automotive Interior Plastic Injection Mould,Automotive Interior Trim Parts,Plastic Car Dashboard,Plastic Car Air Conditioner

Zhejiang Ceeto Molding Technology Co.,Ltd. , https://www.ceetomold.com