Some considerations when installing orifice meter

Some considerations when installing orifice meter


Top Ten Installation Points for Orifice Flow Meters
Orifice plate flowmeter is a commonly used flow measurement instrument, which is widely used in process control and measurement of petroleum, chemical industry, metallurgy, electric power, heating, water supply and other fields. There are many problems to be noticed when installing orifice plate flowmeters. Today, Xiaobian has come to explain the orifice plate flowmeter installation points in detail, hoping to help everyone.
Orifice plate flow meter installation points
1. Before the orifice plate is installed, check whether the throttling device number and size meet the requirements of the pipe installation position.
2. Newly installed pipeline system must be installed after the pipeline is flushed and cleaned.
3, pay attention to the orifice plate installation direction "+" number should be toward the stream.
4. The orifice center should coincide with the centerline of the pipe. The concentricity error must not exceed 0.015 (1/β-1).
5. When the orifice plate is installed in the pipeline, its end face should be perpendicular to the pipe axis, and the verticality error must not exceed ±1°.
6, in order to avoid the transmission of differential pressure signal distortion, positive and negative pressure tube should be placed as close as possible, cold areas should also take antifreeze measures. Electric or steam insulation can be used, but to prevent the measured medium overheat vaporization and gas in the pressure tube caused by false differential pressure.
7. Orifice plate flow meter must be installed tightly, no leakage phenomenon is allowed. Therefore, the installation work must be carried out before the pipeline pressure test.
8. The pressure guiding pipe shall be laid vertically or obliquely, and its inclination shall not be less than 1:12. Higher fluid viscosity, its inclination should also increase. When the differential pressure signal transmission distance is greater than 3 meters, the pressure guiding pipe shall be inclined in stages, and the air collector and the settler shall be installed at each of the highest point and the lowest point.
9. The pressure guiding pipe is made of pressure-resistant and corrosion-resistant materials according to the properties of the measured medium. The inner diameter should not be less than 6mm, and the length should be within 16m.
10. When the orifice plate is installed on the vertical main pipe, the position of the pressure port can be taken and it can be arbitrarily selected on the plane of the pressure device. The plate is installed in a horizontal or inclined main pipe.

Wash Wire

We huatao company has been service of paper industry since 2008 year.

Our Pulp Washing Fabric always got perfect feedback from paper mill.


Materials: Polyester monofilament(PET 100%);

Uses and Features: Mainly used in several of washing equipments and paper making of paper pulp;



Pulp Wire, Pulp Washing Fabric, Polyester Pulp Wire Cloth To Dewater Pulp,Pulp Washing Fabric, Wire Fabric For Pulp Wash, Polyester Mesh For Pulp Washing

HUATAO GROUP LTD , https://www.huataogroup.com